[1]
Do , T. et al. 2024. Start-up Procedure for the Three-Phase Four-Leg Inverter in an AC Battery application. Journal of Measurement, Control, and Automation. 28, 1 (Apr. 2024), 7–13. DOI:https://doi.org/10.64032/mca.v28i1.194.